The Government anticipates the need for a new boiler to be delivered to JBSA-Lackland. The boiler should at a minimum meet the size and utility connection footprint of Cleaver Brooks Model # CBLE-4D-700-100-125HW (460/3/60)-UC-STD/CFG. Installation will NOT be part of this requirement.